The Getinsa-Euroestudios Group has provided the consultancy services for the preparation of the design, Project Coordination and construction supervision of the Ankara-Istanbul High Speed Railway Project.
The new Ankara-Istanbul High Speed Rail Line was designed for an operational speed of 250 km. It has 490 km of electrified double track and 250 km/h of operational speed, 15 stations, 41 km of tunnels and 15 km of viaducts, and incorporates the European Rail Traffic Management and Signaling System ERTMS.
The project was financed by the EIB and complies with the technical specifications set out for interoperability of the Trans-European high-speed rail system.
It should also be highlighted the fact that, to date, the Getinsa-Euroestudios has conducted 33 projects in the country during the last 5 years, of which 11 are railway projects.