Home Members news Ineco engages in the material supply strategy for Rail Baltica

Ineco engages in the material supply strategy for Rail Baltica

por Patricia

Ineco will once again collaborate with Rail Baltica carrying out consultancy services to design the strategy, specifications and technical requirements for the storage of materials.

Our company has been present in the Rail Baltica project since the beginning of 2019, together with other Spanish companies (Ardanuy and IDOM), participating in the design of rail accesses to Riga or in the design of a 94 km section between Vangazy (Latvia) and the border with Estonia.

Since the implementation of Rail Baltica, Ineco has obtained a total of eight contracts in various consulting areas, design and supervision of this important railway infrastructure project. In addition, Ineco has been responsible of the definition of the implementation strategy of the energy system of the entire operation, as well as the analysis and design of the maintenance facilities throughout the line. A sign of confidence that Rail Baltica has placed in the Spanish engineering company since the beginning of the plan.

Artículos relacionados

-
00:00
00:00
Update Required Flash plugin
-
00:00
00:00