Remodeling of the tracks at Montcada – Bifurcación station

Siemens Rail Automation will remodel the tracks at Montcada – Bifurcación station, located in Barcelona. The project, awarded by Adif with an execution period of 26 months, includes the tests, documentation, operations, materials and works necessary for the assembly, execution of the works and installations, establishing the provisions and construction stages required, including in coordination with the contracts of other subsystems, to guarantee rail traffic at all times on the sections of the line that are currently in service.

The planned works include Westrace MK2 IxL, ERTMS, blocking and CTC Barcelona (Controlguide Rail9000) modifications; as well as the implementation of new field elements such as track circuits, LED signals, etc.