52
As part of the “Telephone Blocking System Elimination Plan” currently being developed by Adif, the Spanish rail infrastructure authority, Thales has been awarded a contract to coordinate the construction project and carry out the works on the Ortigueira-Ribadeo section of the 740 metric gauge rail link, which connects Ferrol with Pravia. This new contract runs for 27 months and has a budget of more than €20 million.
Thales will replace the current telephone blocking system by an automated system. All interlockings will be remotely controlled from the Centralized Traffic Control Centre in El Berrón, Asturias.