We continue improving infrastructures in Tunisia

The joint venture that includes TPF GETINSA EUROESTUDIOS and TRN TARYET has secured a contract to conduct the feasibility study and preliminary design for the reinstatement of the west section of Line 11 of the Tunisian rail network between Khazzazia and Kasserine. The client and financing body is the European Investment Bank (EIB) and the recipient of our services is SNCFT.

Line 11 played a major role in transporting ore from inland mines to the port of Sousse. However, rail traffic has been progressively reduced over time to its current state of almost total neglect.

Our aim is to analyze the technical and economic feasibility of the rehabilitation required on the line for mixed passenger and freight traffic, narrowing the existing gap between the developed coastal axis and the rural hinterland.